2025-02-28
Worry-free delivery of precision equipment: safe escort throughout the entire process, efficient direct delivery to customer sites
1. Overall packaging.
Multi-layer protection
2. Split Packaging.
Disassemble by functional units (such as motor group, control cabinet, transmission mechanism).
Transport risk assessment
3. Transport risk assessment.
Plan split or whole transport plans based on equipment size (e.g. 3m long x 1.5m wide x 2m high) and weight (e.g. 2.5 tons).
4. Equipment Pre-check.
Functional test: no-load running test bending accuracy, hydraulic system pressure value, CNC system response.
đội ngũ chuyên nghiệp để phục vụ !